angle-double-right calendar

Sign up today to view these articles!

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Starting Late Next Year: Nationwide Electronic Reporting of Stormwater-Related Information

Oct 27, 2015, 13:11 PM by SPAN
Back in mid-2013, EPA proposed a Clean Water Act (CWA) rule to require nationwide electronic reporting in lieu of manual reporting (e.g., submitting paper forms) for certain types of information associated with stormwater permits, as well as other types of CWA permits.

Some members already electronically report stormwater-related information under their state general permit (e.g., Ohio), or the Federal Multi-Sector General Permit (MSGP) if located in certain states, tribal lands, or U.S. territories. ReMA commented on this proposed rule in late 2013 with great concern about making stormwater monitoring data public without context.

Just this week, EPA issued the final electronic reporting rule. This rule defines the minimum set of stormwater information to be reported electronically. EPA intends to make the information publicly available, with context, through its ECHO database. Starting December 21, 2016, discharge monitoring reports (DMRs) will need to be submitted electronically to the permitting authority (if required by a facility’s permit). Electronic reporting of notices of intent (NOIs), no exposure certifications (NECs), and other facility information (e.g., stormwater BMPs) will begin December 21, 2020.

Members that currently report electronically are expected to be able to use the same electronic reporting procedures in the future. Members that do not yet report electronically will need to register with their permitting authority (e.g., state) once that authority has met EPA’s requirements for electronic reporting. Members will not be penalized if the permitting authority does not meet its obligations. A permitting authority may grant a temporary waiver from electronic reporting if a permittee requests it and provides sufficient justification. Questions about electronic reporting should be directed to ReMA Director of Environmental Management David Wagger at (202) 662-8533.